PORT TARIFF WITH EFFECT FROM 1ST june, 2010
 
1. PORT DUES

Rs. 7.00 Per GRT of Vessel  Minimum Charges Rs. 50000/- per vessel is applicable. (Port dues applicable per call and maximum validity is 30 days ) 

2. PILOTAGE CHARGES

 Rs.18.20 Per GRT of Vessel  MINIMUM RS. 50000/­  VESSEL UP TO 3000 GRT 
MINIMUM RS.175000/­  VESSEL FROM 3001 -15000 GRT 
MINIMUM RS. 375000/­  VESSEL FROM 15001 - 60000 GRT 
Includes one Berthing and one Un-berthing. 

3. BERTH HIRE CHARGES

  Rs.0.30 per GRT per Hour     Minimum Charges Rs.25000/- per Day is applicable. 

4. ANCHORAGE CHARGES

Rs.1.20 per GRT per Day  [A]. Anchorage charges applicable for vessels receiving bunker or carrying out any other operation (as decided by MPSEZL) at anchorage, but not applicable for vessels waiting for MPSEZL berths. 
[B]. If a vessel arrives at Mundra Port and inspite of an availibility of a Berth, the Master does not choose to berth the vessel for any reason (i.e. Option of Owner/Master/Charter/Agent/Shipper/ Receiver), then Anchorage charges as per Port Tariff is applicable 
[C] If a vessel is detained for want of port clearance & waitingat anchorage
 [D] If a vessel is anchored at anchorage at owners/ agents option

5. SHIFTING / WARPING

SHIFTING CHARGES  Rs.18.20 per GRT  Minimum Pilotage Charges  is applicable. 
WARPING CHARGES  Rs. 9.00 per GRT 

6. DUMB BARGE

 Rs. 112500 

 per Activity 

 In addition to port dues/pilot age charges. 
 Activity includes berthing / un-berthing . 
 Any Tug used for Berthing/ Un berthing   will be chargeable 

 Pilot age will start/complete only when   the barge is secured as a

 hip tow to the towing tug 

 If LOA is more than 70 mtrs and beam more than 25 mtrs,  then 

 acceptance will be on case by case basis. 

Note: Barges will only be accepted for berthing alongside if 6 mooring  lines of 60 meters each and adequate man power on the barge for handlingof lines is provided

7. BERTHING PROCESS CHARGES

PILOTAGE CANELLATION CHARGES  Rs.27000/-   If cancelled between 1.00 hrs till pilot boarding 
Rs.70000/-   If cancelled after pilot boarding 
PILOTAGE DETENTION CHARGES  NIL   First 30 minutes delay from the nominated pilot boarding time  
Rs.90000/-   Per 30 minutes slab and applicable when delay is more than 30 minutes. 

8. UN-BERTHING PROCESS CHARGES

PILOTAGE CANCELLATION CHARGES  Rs.27000/-  If cancelled between 1.00 hrs till Pilot boarding 
Rs.70000/-  If cancelled after boarding 
PILOTAGE DETENTION CHARGES  Rs.27000/-  For first 30 minutes delay from pilot boarding time 
Rs.90000/-  For subsequent delays on a slab of 30 minutes. 

9. TUG HIRE CHARGES

TRANSPORTATION FOR PASSANGERS ONLY      (PER TRIP)   RS.100000/-  For maximum 4 hours and Rs.25000/- for every subsequent hour thereafter. If used by two different parties then each party to pay the said charges. (Not more than 15 persons at a time) Applicable for carrying personnel only.  
 RS.75000/-  In addition to tug hire charges in case the ship's stores are carried in excess of quantity 50 kgs.( Not more than 1.5 Mt at one time ) 

10. ADDITIONAL TUG HIRE CHARGES

Rs 30000/- per Hour per Tug  Tug hire charges for any activity (berthing / un-berthing / shifting / warping / tug assistance at berth) other than personnel transfer.  

11. COLD MOVE CHARGES

   1  Cold move will be carried out only on prior approval. Charges for each process of berthing/un-berthing / shifting will be 5 times the  pilotage charges (subject to minimum clause as per point No. 2). 
   2  Tug hire charges will be as per the port tariff on an hourly basis. 
  3  Whenever the engine fails during berthing / un-berthing / shifting / warping - It will be treated as a cold  move & will be charged at twice the normal pilotage charges (subject to minimum clause as per point No. 2) and Additional tugs used for the movement will be as per port tariff on an hourly basis. 

12. PENAL BERTH HIRE

 Rs.45000/- per Hour   Applicable when Vessel is unable to commence cargo operations within 2 hrs of All fast time. 
 Applicable when vessel is not ready to sail (i.e. Fail to book outward pilot memo) after 2 hours from the time of completion of cargo.  

13. ADDITIONAL CHARGES AS PER REQUIREMENT

  1 Immobilization permission will be granted at port s discretion. An immobilization charge of Rs.30000/-per day for the 1st day is payable, and thereafter at the rate of Rs. 15,000/- per 12 hours slab 
  2 For vessels entering at Mundra port limits & not using the berth facilities will be charged as follows. 
   a) Port dues at Rs.7 per GRT (subject to minimum clause as per point No.1) 
   b) Anchorage charges at Rs.1.20 per GRT per Day. 

14. MISC SERVICE CHARGES

MISC CHARGES   SECURITY   Rs. 2300/-   Per calendar day/per guard 
 GARBAGE   Rs. 1200/-   Per collection 
 GANGWAY   Rs. 4500/-   Per calendar day 
 HYDRA  Rs. 8000/-   Per 4 hour slab (minimum) 
 SHIP CHANDLING   Rs. 5000/-  Per shipping bill 

 FRESH WATER 

[Port supplied qty is final qty]

 Rs. 225/-   Per MT 
 MARINE ENTRY PASS (Annual)   Rs. 300/-   Per Registered personnel per annum 
 MARINE ENTRY PASS (Temporary)  Rs. 200/-   Per person per month for Temporary pass 
 INVOICE REVISE   Rs.20,000/-   Per cancellation of Invoice 
 NDC REVALIDATION   Rs.1,000/-   Revalidation or changing NDC 
 HOT-WORK PERMISSION   Rs.1,000/-   Per 4 hour slab (minimum) 

15. SPM TERMINAL

PORT DUES  0.17 USD per GRT   
PILOTAGE CHARGES  0.40 USD per GRT   
BERTH HIRE  0.15 USD per GRT per DAY    
PULL BACK TUG CHARGES  RS. 280000/-  PER 8 HRS SHIFT(All FAST TIME TO COMMENCE UNMOORING)
ADDITIONAL TUG CHARGES  RS. 30000/- Per Hour Per Tug.    
LAUNCH HIRE CHARGES    (TRANSPORTATION FOR 4 HRS) (PER TRIP)  RS.250000 /-  For maximum 4 hours and Rs.50000/- for every subsequent hour. If used by two different parties then each party to pay the said charges. 
RS.75000/-  In addition to tug hire charges in case the ship's stores are carried in excess of quantity 50 kgs. 
PILOT STAND-BY CHARGES  RS. 4500/- Per Hour. 
OIL POLLUTION CESS  0.50 PAISE  Per Metric Ton.  
ANCHORAGE CHARGES  0.025 USD   Per GRT / Per Day 
NOTE: FOR IOCL CHARTED VESSELS FOLLOWING ARE NOT CHARGEABLE i) PULL BACK TUG CHARGES. ii) PILOT STANDBY CHARGES. iii) OIL POLLUTION CESS.   

 

 

 

 

 

 

 

 

 

 

 

 

16. SHIP TO SHIP TRANSFER OPERATIONS (STS)

 FOR MOTHER 

 VESSEL0

 INR 7/- PER GRT   PORT DUES 
 INR 1.20/- PER GRT PER DAY   ANCHORAGE CHARGES 
 INR 12/- PER TON   WHARFAGE& CARGO THROUGHPUT CHARGES  
 INR 50000/- PER TRIP   TUG FOR INWARD CUSTOM CLEARANCE (MAX. 4 HOURS) 
 INR 50000/- PER TRIP 

 TUG FOR OUTWARD CUSTOM CLEARANCE (MAX. 4 

 HOURS) 

 FOR DAUGHTER 

 VESSEL 

 

 

 INR 7/- PER GRT   PORT DUES 
 INR 1.20/- PER GRT PER DAY   ANCHORAGE CHARGES 
 INR 100000/- LUMP SUMP   PILOTAGE CHARGES 
 INR 50000/- PER TRIP   TUG FOR INWARD CUSTOM CLEARANCE (MAX. 4 HOURS) 
 INR 50000/- PER TRIP 

 TUG FOR OUTWARD CUSTOM CLEARANCE (MAX. 4 

 HOURS) 

 INR 200000/- LUMP SUMP 

 BERTHING CHARGES (TWO TUGS FOR MAX. 4 HOURS

 EACH) 

 INR 200000/- LUMP SUMP 

 UNBERTHING CHARGES (TWO TUGS FOR MAX. 4 HOURS

 EACH) 

17. OIL SPILL CONTAINEMENT CHARGES

 RS. 2000000/-  Includes Mob/Demob charges of Oil Spill containment resources and Collection,  Storage and Disposal of oil. 

 Disposal charges  as per actual (case to  

 case basis)  

18. Tariff for Equipments / Gear Hiring

SR NO. EQUIPMENT RATE Slab charges (minimum chargeable - one slab - 4 hrs)
1  FORKLIFT  32 MT SWL RS. 12500/- 04 HRS 
2  FORKLIFT SHIFTING BY  SHORE CRANE RS.3500/-  EVERY SHIFTING Per activity.                               (jetty to hatch - oneshifting)                                       (Hatch to jetty - one shifting)                                    (One Hatch to another hatch -two shifting)
3 " C" HOOK, 30 MT SWL RS.1000/-  04 HRS 
4  SHORE POWER SUPPLY RS. 50/-  PER UNIT/PER HRS 
5  EXCAVATOR EX - 200/210 RS. 9500/-  04 HRS 
6  Weigh Bridge Charges Rs 80/-   

19. WATERFRONT ROYALTY (payable on Cargo Landed or Shipped through Mundra Port )

Sr.NO. Commodity Unit per Rate in Rs.
A  CHEMICALS     
1 Solids      
  Salt other than vacuum and edible M. Ton  20/- 
  Salts vacuum and edible including iodised, gypsum M. Ton  15/- 
  Soda ash, Caustic Soda M. Ton  20/- 
  Salt and gypsum (Unprocessed) M. Ton  10/- 
  All other solid chemicals other than petroleum derivatives M. Ton  45/- 
2 Liquids    
  Ammonia, Phosphoric Acid, Ethylene, EDC M. Ton  120/- 
  All other liquid chemicals other than petroleum deriv. M. Ton  50/- 
3 Fertilisers and Fertiliser raw materials M. Ton 35/- 
B  AGRI PRODUCTS      
1 Food grains and pulses M. Ton  35/- 
2 Seeds, Vegetable Oil (bulk) M. Ton  35/- 
3 Fruits, Betel nuts, Vegetables 50 kgs.  10/- 
4 Molasses, Sugar, Onions, Guar Gum, Coconuts, others M. Ton  20/- 
5 Oil cakes, de-oiled extractions M. Ton  20/- 
C  IRON, STEEL, MACHINERY     
1 Scrap - shredded - steel, metal, iron M. Ton 55/- 
2 Scrap - HMS, others M. Ton 75/- 
3 Sponge iron, HB iron, HR/CR coils, pigiron, iron slabs M. Ton 55/- 
4 Steel pipes, plates, sheets, cement coated pipes M. Ton 60/- 
5 Machinery and parts M.Ton/CBM 50/ 
D  MINERALS AND ORES      
1 Bauxite, Bentonite  M. Ton  25/- 
2 Calcinated Bauxite, Coal, Coke, Charcoal, Firewood  M. Ton  30/- 
3 Lignite, Lime stone  M. Ton  20/- 
4 Flourspar  M. Ton  35/- 
E  PETROLEUM & PETROLEUM DERIVATIVES     
1 Crude Oil M. Ton  12/- 
2 Asphalt, Bitumen and Coal tar M. Ton  35/- 
3 Lubricating Oil (fuel oil), Propylene, Paraxelene M. Ton  60/- 
4 HSD, Kerosene, Naphtha, Petrol, LDO, Furnace Oil M. Ton  50/- 
5 LPG, LNG, Butane M. Ton  110/- 
F OTHER COMMODITIES    
1 Cement, Clinker M. Ton 35/- 
2 Wood and Timber including logs M.Ton/CBM 35/- 
3 All non hazardous solid cargo not listed in above categories M. Ton 50/- 
4 All non hazardous liquid cargo not listed in above categories M. Ton 60/- 

20. Tariff for handling Bulk Cargo with shore cranes fitted with Grabs of 27 to 32 CBM for wheat

1. Crane hire : RS. 68.00 per Metric Ton + Applicable Service Tax  
2. Grab hire  :  RS. 115.00 per Metric Ton + Applicable Service Tax  

21. Project Cargo Stevedoring Rates to be applicable from 1st June, 2010

1. Up to 25 Freight Tons                                                                   INR 250 per Freight Ton 
2. Over 25 & upto & incl 40 Freight Tons                                           INR 350 per Freight Ton 
3. Over 40 Freight Tons Or over 15 meter length                                 NR 650 per Freight Ton 
*Dunnage, Choking and lashing material cost shall be charged extra at actual if required.
*Shore crane hire charges applicable from 1st June, 2010: Rs. 12,000 / Hr, with minimum charges of 2   hours and above that on hourly basis.

22. STEVEDORING CHARGES ON STEEL CARGO (PIPE, COILS & PLATE)(IMPORT/EXPORT)**

1 Steel Plates / Slab  Rs. 110/ MT
2 Steel Pipes below 18 inches OD  Rs. 200/ MT
3 Steel Coil  Rs. 100/ MT
4 Steel pipes from 18 inches OD to 56 inch OD  Rs. 180/ MT
** MPSEZ will allow for stevedoring (export) of steel plates, slabs, coils and pipes at Rs.
65/- Mt royalty subject ot prior notice of about 07days and confirmation of same by MPSEZ
** Above charges are excluding dunnage, lashing, choking material and any other special requirement of the shipment.    
Same to be provided by vessel / vessel agent in advance before    
berthing of the vessel.
*Above rates are applicable for standard dimension steel cargo as per below table.

 

STEEL CARGO HANDLING DIMENSIONS / WEIGHT
S. NO       COMMODITY                                               SIZE  WEIGHT IN MT
    LENGTH  WIDTH  HEIGHT  THICKNESS  
1 STEEL COILS    1.8MTR 1.8MTR   32MT
2 STEEL PLATES /
BUNDLE
12.5 MTR 4 MTR   25.00 MM 24MT
3 STEEL SLABS 7.0 MTR 2.0 MTR     32MT
4 STEEL BARS 12.5 MTR   In bundles   10MT
5 PROJECT CARGO* 15 MTR 4MTR 3.5MTR   30MT
6 STEEL PIPES          
7 2 OD ‐ 12 OD 12.5 MTR   Inbundles   10MT
8 14 OD ‐ 56 OD 12.5 MTR   Single Pipe   10MT
  Mpsez will allow direct delivery /carting of project cargo exceeding above dimension.
In case same is desired to be handled by mpsez, same is to be discussed with
port marketing team on case to case basis.

 

Other than above mentioned standard dimension for steel cargo, rates can be obtained
from port marketing desk.
Point No 9: Penal Berth hire as per port tariff will be applicable for all vessels, idling at
berth due to following:
(1) Idling of vessel on account of following :                                                                                                                                           • Mis-declaration of cargo as prescribed in clause 15: If vessels crane are unable to
discharge the said cargo, Penal Berth Hire will be applicable from the time of idling
due to said package till the time, vessels request for the shore crane.
• Mis-declaration of vessels gear/capacity as prescribed in clause 15: Penal Birth hirecharge will be applicable till the time, vessels request for the shore crane. (2) Non-Commencement of cargo operation within 2 hours of all fast time: In case the vessel
requires to undergo any preloading surveys, allowance of additional 01hour will be provide in such cases subject to advance intimation at the time of declaration & written confirmation from the POC.                                                                                                                                                                                                             • • Cargo operation to commence on 1st hook / hatch within 2 hours of all fast time.
(03 hours in case of permitted preloading survey).
• Cargo operation to commence on all hooks / hatches within 04 hours of all fast time.
(05 hours in case of permitted preloading survey)                                                                                                 

  (3) Total idling of vessel’s cranes exceeding 10% of total available crane hours / day subject
to max idling/stoppage of not more than 4 hours/day in totality on a single working crane
will be considered for penal berth hire. However, vessel / vessel agent can request for
shore crane in case of unavailability of vessel crane to perform respective operation for
required 90% of crane hours/ day to avoid Penal Berth Hire Charges. All request to be provided o stevedoring department in physical written form in advance.

 

• Any single crane idling cannot exceed 4 hours per day, if it exceeds then the
entire time above 4hours will be counted for penal berth hire.
• Total idling of vessel cranes in totality should not exceed 10% of total available
crane hours.
• Both conditions to be read separately.
• Agent to request shore crane in advance to avoid penal berthing hire.
• Penal berth hire in cases due to breakdown/non availability/misdeclaration of crane
capacity/cargo particulars will be at the rate of Rs. 11,250/- hr/hook.
(4) This intermediate penal berth hire will be charged Rs.11250/hr/hook as calculated
below:          
(5) Example A:
* Vessel: x with cargo gear 4 x 25 MT SWL crane.
• Maximum Available crane hours per day = 4 X 24 = 96 hours. 10% of 96 hrs = 9.6 hrs
rounded off to 10 hours. Therefore, a minimum of 86 crane working hours have to be
made available to avoid Penal Berth Hire Charges or total idling time permitted for all
cranes is not to exceed 10 hrs subject to no single crane being idle for more than 4 hrs per
day (24 hrs).
> Supposing the crane stoppages in 24 hrs are as follows
• Crane 1 total stoppage 6 hrs and 30 minutes,
• Crane 2 total stoppage 1 hr,
• Crane 3 total stoppage 4 hrs and
• Crane 4 total stoppage Nil.
• Then, Total Crane idling = 11.5 hrs.
• Allowed idling = 10.0 hrs.
• Therefore, penal berth hire applicable : 1.5 hrs
• Crane one: 6.5 - 04 hrs (allowed) = 2.5 hour penal berth hire on crane one.
• Total penal berth hire charged: 1.5 + 2.5 = 4.0 hrs.
• Total amount applicable for “Penal Berth Hire” = 4.0 x 11,250 / Hr = Rs. 48,000 +
Applicable service Tax.
Housekeeping of storage area: All basic housekeeping required to be done bt occupier
of all the storage area given on rent for long term basis.
 
   
   
               
   
   
 
   
 
             
 
   
   
               
   
   
 
   
 
             

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23. TARIFF FOR HANDLING BREAK BULK / PROJECT CARGO

1 Shore Crane Hire:   12000/Hr
2 Crane Hire charges applicable from 01st June, 2010 for break bulk & project cargo

24. TARIFF FOR HANDLING BULK CARGO OTHER THAN WHEAT

1 Crane + Grab Hire Rs. 25.00 per Metric Ton + Applicable Service Tax

Berthing Policy & Port Tariff Wef 01st june 2010
MPSEZ Railway Services Tariff With Effect From 01st June 2009

Terms of Use   Sitemap   Contact Us
Best viewed at 1024x768 Resolution on Windows IE 5.5 and above © Mundra Port | Site Developed and Maintained by G2